

Properties above.
Water networks below.
An Omani company in Nakhal. We build water networks: new mains, house connections, and ageing lines made sound again. And connecting the right people with the right opportunities in real estate.
Two lines of work
One company, two lines of work.
- 01
Water networks
We build them, below the street: new mains tied into the live network, the connection to every house, and ageing lines brought back to sound condition.
- Water pipeline extension and connection
- House connections
- Pipeline rehabilitation
- 02
Real estate
In real estate, we connect people with the right people, and put them in touch with partners we know and trust.
- Residential property
- Commercial property
- The right introductions
The whole line

Every tap in a home is the last metre of a long line. We take care of the whole line: the main in the street, the connection to the house, and the old pipe that needs to be made sound again.
Experience
Experience, laid end to end.
Every year our people have spent on site, laid end to end in one run of pipe.
72years on site, combined64 of them on Oman's own water networks
Between them, our people hold WRC Academy certification to Nama Water Services' specification for service pipes (2024) and the Public Authority for Water's approval for operating and maintaining North Al Batinah's main water transmission system (2019).
Water networks
Three services, each built to the approved specification.
Laying new water mains and distribution lines, in HDPE and other pipe types, and tying them into the live network.
- Trench excavation by machine, and by hand around existing services
- Laying HDPE and other pipe types to the approved alignment and depth
- Electrofusion and PPR welding of joints and fittings
The service line from the main to the meter, installed by a team certified to Nama's service-pipe specification.
- Service line from the main to the property boundary
- Meter assembly and riser at the boundary wall
- Installation by a team certified to Nama's service-pipe specification (2024)
Bringing ageing water lines back to sound condition, so the network runs efficiently again.
- Locating and exposing the existing line
- Replacing damaged sections and fittings
- Reconnecting the services along the line
- 1Open the trench
- 2Lay and fuse the pipe
- 3Tie in, water on
- 4Tape and backfill



How a line goes in
Lay. Protect. Reinstate.
- 01 / 03

Lay
The pipe goes in at the specified depth, on a clean bed, along the approved alignment.
- 02 / 03

Protect
Blue warning tape runs above it, so whoever digs here next knows there is water below.
- 03 / 03

Reinstate
The trench is backfilled in layers, compacted, and handed back level.
On site
Same wall, before and after.
A house connection in progress, and the same front wall once the trench is backfilled and compacted.
See our work

Track record
Between them, our people have worked on networks and contracts for Nama Water Services and, before it, the Public Authority for Water, and for Galfar Engineering & Contracting.
- Nama Water Services
- Galfar Engineering & Contracting
Experience of our team members on these organisations' networks and contracts.
Where we are
Based in Nakhal, South Al Batinah.
Our office is in Halban, Wilayat Nakhal, within reach of Muscat and the Batinah coast.
Water main
A line to lay, a house to connect, or a development in mind?
Or email info@vision-international.me · +968 9113 0128